Search Site

This search form uses an instant search feature. As you type, search results will appear automatically below the search field. When you've entered you desired search terms use tab to navigate through the available results and hit enter to open the selected page or document.
Building Changes
Building Changes
Troy Marnholtz
Monday, June 18, 2018

new Kindergarten room being renovated.  The old wall was removed for increased space. 

The new walls are being installed for the 1/2 grade room.  

The wall separating the 1/2--3/4 rooms being installed.

The carpet and shelving has been removed from the library.  The new tile and cabinets will be installed making the 5/6 room.  

The renovation is going smoothly.  The RCI group is doing a great job getting everything ready.  

The summer staff and custodians are getting the other two rooms prepped and ready as well.  We are looking forward to the new start to school in August.